Hydrocarbons & Solvents
Media Overview
Hydrocarbons & Solvents — Media Overview
Hydrocarbon services range from light ends that flash at the seal faces (ethane, propane, butane, LPG) through solvents and aromatics (naphtha, benzene, toluene, xylene) to heavy oils that coke at 250–400 °C (gas oils, residue, bitumen). Light ends are governed by vapour-pressure margin and emissions, heavy ends by temperature and coking. For plant-level selection see Refinery, Refinery Treating & Light Ends and Oil & Gas.
Key Sealing Challenges
- Vapour-pressure margin: light ends need seal-chamber pressure at least 3.5 bar, or 30 %, above the fluid’s vapour pressure at chamber temperature (API 682 basis), or the film flashes and the faces open.
- Emissions and toxicity: benzene and other VOCs need Arrangement 2 or 3 containment and on-site EPA Method 21 monitoring.
- Low lubricity: low-viscosity light ends need faces with good dry-running tolerance (SiC vs premium carbon) and balanced designs.
- Coking: hot oils oxidise to coke on the atmospheric side; metal bellows seals with flexible graphite and a Plan 62 steam quench are used.
- Sour service: H₂S-bearing crude needs metal parts to NACE MR0175 / ISO 15156.
Which mechanical seal is used on LPG and butane pumps?
A balanced cartridge seal with SiC vs carbon faces is used, with API Plan 11 to hold seal-chamber pressure above vapour pressure. Most refineries specify Arrangement 2 (tandem, Plan 52 buffer) or Arrangement 3 (pressurised, Plan 53A/53B) so that any primary-seal leakage is contained.
Root-Cause Failure Analysis — Field Example
Symptom: Butane pump seal leaks in bursts; ice forms on the gland; faces show heat checking.
├── Incorrect Response: "Fit harder faces."
├── Diagnostic Evidence Required:
│ ├── Seal-chamber pressure vs vapour pressure at chamber temperature (margin ≥ 3.5 bar or 30 %).
│ ├── Is the Plan 11 orifice correctly sized and clear?
│ └── Is seal-chamber temperature raised by recirculation heat?
└── Engineered Solution:
├── Restore vapour margin (Plan 11 orifice, throat bushing, or Plan 13/23 as appropriate).
├── Balanced SiC vs carbon faces.
└── Tandem seal with Plan 52 buffer and Plan 76 vent to flare for containment.
Frequently Asked Questions
Why are metal bellows seals used on hot oil pumps?
Above about 200 °C elastomers lose life and coke forms on the atmospheric side. A stationary metal bellows seal uses flexible graphite secondary seals and no dynamic O-ring, and a Plan 62 steam quench keeps coke from forming.
Which elastomer suits aromatics such as benzene and toluene?
FKM performs well in aromatics; FFKM is used for mixed solvents or where the service changes. EPDM is not used in hydrocarbons. Related: Refinery · Upstream Oil & Gas · Toxic & Hazardous Chemicals.
Request a Seal Selection
Send the fluid name and concentration, SDS, temperature, suction and discharge pressure, pump make and model, shaft size and speed to info@gipfelengg.com or use our enquiry form. Gipfel Engineering (ISO 9001:2015, NSIC-registered MSME, Mumbai) designs and manufactures mechanical seals, seal support systems and process pumps.
Equipment solutions: Overhung Pumps · Between-Bearings Pumps · Vertical Can Pumps.
Pump Duty & Mechanical Seal Selection Matrix
Typical values for selection guidance only. Final selection is made against the customer duty sheet and the fluid SDS.
| Pump duty | Fluid | Typical temp. | Typical pressure (bar) | Seal arrangement | Faces / elastomer | API piping plan |
|---|---|---|---|---|---|---|
| LPG / Propane / Butane Pump | Light ends, flashing | -20 to 40 °C | 10–30 bar | Tandem double cartridge (unpressurised) | SiC vs carbon / low-temperature FKM | API Plan 11 + Plan 52 (+ Plan 76) |
| Naphtha / Gasoline Pump | Light naphtha, gasoline | Ambient–80 °C | 5–20 bar | Balanced multi-spring cartridge | SiC vs carbon / FKM | API Plan 11 |
| Benzene / Aromatics Pump | Benzene, toluene, xylene | Ambient–120 °C | 3–15 bar | Double cartridge, back-to-back (pressurised) | SiC vs carbon / FKM or FFKM | API Plan 53A/53B |
| Crude Oil Transfer Pump | Crude, may be sour | 30–120 °C | 5–30 bar | Balanced multi-spring cartridge | SiC vs SiC / FKM; metals to NACE MR0175 | API Plan 11 or Plan 32 |
| Gas Oil Pump | AGO / VGO | 200–350 °C | 5–20 bar | Stationary metal bellows cartridge | SiC vs carbon / flexible graphite | API Plan 32 + Plan 62 steam quench |
| Residue / Bitumen Pump | Vacuum residue, bitumen | 200–380 °C | 5–15 bar | Stationary metal bellows cartridge | SiC vs SiC / flexible graphite | Plan 32 + Plan 62 steam quench; heated gland |
Reviewed by Gipfel Engineering’s technical team.
Technical Information Disclaimer
The information on this page, including process descriptions, flow diagrams, operating ranges, seal arrangements, materials and piping plans, is general technical guidance for information only. Values shown are typical industry ranges, not guaranteed ratings or specifications of any Gipfel Engineering product. Each application differs. Seal selection, material compatibility, installation and operation must be verified by qualified personnel against the specific equipment data sheet, process conditions, applicable codes and the pump manufacturer’s instructions. A binding recommendation is given only in a written quotation or technical offer from Gipfel Engineering.
References to standards (such as API 682, ISO 21049, ISO 3069, FDA 21 CFR 177.2600 and NACE MR0175 / ISO 15156) describe common industry practice. They do not mean that any product is certified, qualified or approved to that standard unless this is confirmed in writing for a specific order. Third-party company and product names, including “equivalent to” references, are used for identification only and remain the trademarks of their owners. No affiliation, endorsement or OEM approval is implied.
Compliance with safety, hazardous-area, environmental and statutory requirements at the user’s site remains the responsibility of the plant owner or operator. To the extent permitted by law, Gipfel Engineering accepts no liability for loss or damage arising from reliance on this general information without a confirmed written recommendation. Content may change without notice.